This project included the construction of a new parking lot for the Big Ass Solutions Sumitomo Building, including demolition, fine grading of parking lot subgrades, storm drainage, erosion prevention, sediment control, an 18″ concrete box curb/gutter, a 4″ thick concrete sidewalk and aggregate base, handicap signage, and seed and straw application. Unbeknownst to Marrillia at the outset of construction, the existing soil on site was fatty clay, which was unsuitable for the parking lot subgrade. Marrillia remediated this issue by performing lime stabilization to the existing soils, thereby allowing Marrillia to proceed with the parking lot construction.