The Project

This project consisted of a New Consolidated Administration Facility for the Frankfort Plant Board. The new facility is located at the corner of Sewer Blvd and Flynn Avenue, at 151 Flynn Avenue. The new facility consisted of an Office and Assembly area to support the owner’s program. The new facility is 3 levels at an approximate 46,000 SF cumulative area. Ground level is constructed of steel frame with a dedicated hardened concrete zone for emergency use below grade. Levels one and two and the roof are constructed of steel frame and both levels are above grade. Exposed exterior finishes included architectural precast panels, metal skin panels and aluminum curtain wall. Site features included a pneumatic teller drive thru system, drives, parking, landscaping, concrete and paver courtyards, and retaining walls. As part of the scope or work, backup electrical service and protocol mechanical services were provided.

LOCATION

Frankfort, KY

ARCHITECT

GRW Engineers

OWNER

Frankfort Plant Board

STATS

$ 0
COST
0
SQUARE FEET
0
CUBIC YARDS OF CAST-IN-PLACE CONCRETE
Related Projects

Start typing and press Enter to search