The Project

Expansion of an existing sequencing batch reactor system at the Waste Management Outer Loop landfill in Louisville. The expansion includes the installation of two (2) new glass-lined tanks, a reinforced concrete containment dike, an equipment storage building, equipment installation, site improvements and associated system piping.

LOCATION

Louisville, KY

ARCHITECT

BTM Engineering

OWNER

Jim Stamm, Waste Management

STATS

$ 0
COST
Related Projects

Start typing and press Enter to search